Tour Our 110,000 Square Foot
Production Facility













Beachside Select Series

Beachside Series

Beachside Economy Series

Big Lake Lodge Superloft Series

Big Lake Lodge Series

Coastal Living Series

Mojave Series

Mojave Series

Click pictures for a larger view.


 

Stations 1 - 4: Floor Department

  
Purchased Frame Inspection

   
Serial Number Applied


Bottom Board Installed

   
Perimeter Rail Installed


Borate Floor Joists Installed 16" On Center
Heat Duct Installed
Water Lines installed


Insulation Installed in Floor


3/4" Plywood Decking Installed


Moisture Barrier Installed between Sub-floor and Finished Floor


3/4" Natural Red Oak Hardwood Floors Installed


Both Sub-Floor and Finished Floor are 3/4"


Vinyl Flooring and Carpet Installed

   
Return Air Location Cut in Floor


Start Above Floor Plumbing


Air Vents Installed in Floor

     
Finished in the Floor Department

Stations 5 - 8: Interior and Exterior Wall Department

   
Interior Wall Set                   Install Tub / Shower


Exterior Walls Constructed on Wall Table

     

     
Interior Walls Set First, then Exterior Walls

    

     
Walls Insulated


Ready to go to Roof Department

Stations 9 - 12: Roof Department

    
Roof Built, Engineered Trussed Rafter System, 16" On Center

     
Roof Installed


Loft Being Built


Roof Insulated Awaiting OSB Sheathing

Stations 13: Exterior Sheathing Department

     
OSB Sheathing Installed

     
House Wrap Installed Prior to Finished Exterior Placement

Stations 14: Windows & Doors Department


Install Doors

     
Install Windows

Stations 15 - 16: Exterior Siding Department

     
Finished Exterior Placement

     

     
Log Exterior Stained, Sealed and Caulked

   
Installed Exterior Siding

     
Roof Shingles or Metal Installed


A Look Down the Production Line

Stations 17 - 24: Interior Trim, Cabinet Set and Final Inspection Departments

       


Cabinets Produced in our Custom Cabinet Shop

   
Install Cabinets

   


Set / Install Water Heater

     
Exterior Labels Installed So Water Hook-Ups, Gas Hook-Ups, etc. Clearly Marked

     
Floor Registers Installed

     
Panel Box Complete and Labeled, Cabinet Door Installed Over
 

           
Finish Electrical Receptacles, Switches and Covers


Recessed Lighting Installed

     
Install Cabinet Doors


Install Closet Mirror Doors


Install Smoke Detector


Install Appliances


Ceiling Fan Installed


Install Towel Bar


Install Shower Rod and Curtain


Install Toilet Paper Holder

     
Install Drapery Package

     

     
Additional Options Installed

     
Exterior Shutters Installed


Exterior Water Spigot Installed

   
Affix Third Party Plate


Affix Data Plate

     
Final Inspection by General Manager / Ready to Ship to Customer