Click pictures for a
larger view.

Stations 1 - 4:
Floor Department

Purchased Frame Inspection

Serial Number
Applied

Bottom Board
Installed

Perimeter Rail
Installed

Borate Floor Joists Installed 16" On Center
Heat Duct Installed
Water Lines installed

Insulation Installed in Floor

3/4" Plywood Decking Installed

Moisture Barrier Installed between Sub-floor and
Finished Floor

3/4" Natural Red Oak Hardwood Floors
Installed

Both Sub-Floor and Finished Floor are
3/4"

Vinyl Flooring and
Carpet Installed

Return Air Location Cut in
Floor

Start Above Floor
Plumbing

Air Vents Installed in
Floor

Finished in the Floor
Department
Stations 5 - 8:
Interior and Exterior Wall
Department

Interior Wall
Set
Install Tub / Shower

Exterior Walls
Constructed on Wall Table


Interior Walls Set First, then Exterior
Walls


Walls
Insulated

Ready to go to Roof
Department
Stations 9 -
12: Roof Department

Roof
Built, Engineered Trussed Rafter System, 16" On
Center

Roof Installed

Loft Being
Built

Roof Insulated Awaiting
OSB Sheathing
Stations 13:
Exterior Sheathing Department

OSB Sheathing
Installed

House Wrap Installed Prior to Finished Exterior
Placement
Stations 14:
Windows & Doors Department

Install
Doors

Install
Windows
Stations 15 -
16: Exterior Siding Department

Finished Exterior
Placement


Log Exterior Stained,
Sealed and Caulked

Installed Exterior
Siding

Roof Shingles or Metal
Installed

A Look Down the
Production Line
Stations 17 -
24: Interior Trim, Cabinet Set and Final Inspection
Departments


Cabinets Produced in our Custom Cabinet
Shop

Install Cabinets


Set / Install Water Heater

Exterior Labels Installed So Water Hook-Ups, Gas
Hook-Ups, etc. Clearly
Marked

Floor Registers Installed

Panel Box Complete and Labeled, Cabinet Door
Installed Over

Finish Electrical Receptacles,
Switches and Covers

Recessed Lighting Installed

Install Cabinet Doors

Install Closet Mirror Doors

Install Smoke Detector

Install Appliances

Ceiling Fan
Installed

Install Towel Bar

Install Shower Rod and Curtain

Install Toilet Paper Holder

Install Drapery Package


Additional Options
Installed

Exterior Shutters Installed

Exterior Water Spigot Installed

Affix Third Party Plate

Affix Data Plate

Final Inspection by General Manager / Ready to Ship
to Customer